Clintele
|
SN |
Name of the Place and the Work Completed |
Branch Name |
Work Description |
|
1 |
Uttam Galva Metallics Ltd. |
Kohli Engineering (Petty Contracting from Raghupower Engineering P Ltd.) |
Project Management Power Plant (75 TPH WHRB Boiler & 15 MW ) |
|
2 |
Uttam Galva Metallics Ltd. |
Kohli Engineering (Petty Contracting from Raghupower Engineering P Ltd.) |
Operation & Maintenance for the 15MW power plant and 40TPH Boiler |
|
3 |
Uttam Galva Metallics Ltd. |
Kohli Engineering (Petty Contracting from Ujjwala Techno Works) |
Operation & Maintenance for the 15MW power plant and 40TPH Boiler |
|
|
Uttam Galva Metallics Ltd. |
Kohli Engineering (Petty Contracting from Ujjwala Techno Works) |
Operation & Maintenance for the 40 TPH Boiler & Turbo Blowers 2 Nos. |
|
5 |
Feedback Ventures |
Kohli Engineering |
Manpower Supply for the O&M of the biomass power generation plant at Rajasthan |
| 6 | Yantrik Engineers | Kohli Engineering |
Manpower supplu for the Erection of 500 TCD jaggery plant (Sharradha Agro & Power Ltd, Hadshi, Pune) & (Shiv Malahar Agro farms Ltd.. Yavat) |